102. If the hydrogeological conditions are such that the water from a landfill site flows on the surface or resurfaces before 2 years and does not comply with the standards prescribed in section 104, a collection system must be installed and maintained so that the water is treated so as to comply with the standards, unless it is treated with the mill’s process water or discharged into a sewer system.
O.C. 808-2007, s. 102; 994-2023O.C. 994-2023, s. 111.